The school held a special inspection meeting for the mid-term teaching of the second semester of the School of Information Engineering in the 2023-2024 academic year
2024-05-14 School of Information Engineering Author: Guo Jingjing Review: Zhai Shuying 点击:[]
In order to fully implement m88 online bettingthe fundamental task of “cultivating people with moral integrity”,Strengthen teaching management,Discovered teaching problems,Improve teaching quality,At the same time, make preparations for the undergraduate education and teaching qualification assessment,The morning of May 13, 2024,The school conducts a special m88 slot machine casinoinspection of the School of Information Engineering around the content of the undergraduate teaching qualification evaluation index system。Vice President Chen Peng attended the meeting,Academic Affairs Office、Quality Management and Assessment Office、Party Committee Student Affairs Department、Human Resources Department、Teacher Development Center、Admissions and Employment Center and other related staff、Dean of the School of Information Engineering、Vice Dean、Office Director、Professional person in charge、Course leaders and academic staff attended the meeting。The meeting was chaired by Ren Hua, Deputy Director of the Academic Affairs Office。
First,Run by Vice President Fan Hui from the daily teaching of the college、Teacher Lesson Plan、The completion and archiving of teaching materials such as teaching calendars and the approval status of teachers’ mediation classes、Completion status of the construction of ideological and political model courses for college-level courses in 2023、2024 Graduation Project (Thesis) Inspection、Experiment、Internship training inspection、Laboratory examination、2024 graduate qualification review work and student status management related work、Students’ attendance and study style、Implementation of examination style education activities、Development m88 online sports bettingstatus of academic activities、Introducing the mid-term teaching inspection work of the School of Information Engineering from several aspects including the symposium between teachers and students,Summary of existing problems and solutions。Finally, the difficulties existing in the work were put forward based on the actual situation of our hospital。
Subsequently,The school inspection team inspects the college’s observation point materials,Feedback item by item on the problems discovered during the inspection of our hospital’s construction evaluation materials,The inspection team provides opinions and suggestions on the quality and effectiveness of undergraduate talent training。And communicated and communicated with the college office staff and relevant persons in charge,While responding to the inspector’s questions,The assessment indicators of some observation points are also more clear。
Continue,Convene a mid-term teaching inspection school leadership symposium。Teacher representatives participating in the meeting review and build work、Daily teaching operation、Professional construction、Questions about follow-up work were raised in laboratory construction and other aspects,Quality Management and Assessment Office、The Academic Affairs Office and other relevant departments will answer questions raised by participating teachers,And provide work guidance。
Last,Feedback from school leaders。Vice President Chen Peng introduced the current work in charge,Emphasis on logistics support、Student Campus Safety、The importance of network security and other tasks,And communicated with on-site teacher representatives,Replied to water quality in student apartments、Problems regarding shuttle bus commuting。He pointed out in his speech,In this m88 slot machine casinoinspection of the School of Information Engineering, one is the positive mental outlook of teachers,Second, adequate preparation of materials for construction evaluation work,Third, there is little feedback on major inspection issues。He requested,In the follow-up work, two relationships must be properly handled: First, the relationship between daily teaching work and qualification assessment work must be properly handled;The second is to handle the balanced arrangement between the work of the secondary college and the work deployment of the school,Be highly consistent。He emphasized,All departments in the school need to have good communication and coordination skills,Able to cooperate closely,Solve work problems in a timely manner。The college should take the initiative to communicate with various departments,Understand their needs and opinions,And make timely coordination,Thus effectively improving the overall work efficiency of the college。
The college will use the "Qualification Evaluation Index System for Undergraduate Teaching Work in General Universities" as the guideline,Continue to strengthen the in-depth understanding of the connotation of construction evaluation indicators,We will take the feedback from this special inspection meeting as the basis,Deepen the material content,Constantly do the work of praise and construction,Continuously improve the level of education and teaching and the quality of training applied talents。