The school and Datang Electric Power Shuhe Hydropower m88 online bettingm88 slot machine casinoPlant carry out "production、Study、Research" cooperation and exchange
2024-05-17 School-Enterprise Cooperation Management Center Author: Cui Yan 点击:[]
In order to further strengthen the connotation construction of school education and teaching,Improving the quality of talent training,In-depth discussion on the realization path of industry-university-research cooperation model,Invited by Shuhe Hydropower Plant of Datang Electric Power Hanjiang Investment and Development Co., Ltd.,May 14, 2024,Vice Principal Zhu Yanbo、Cui Yan, Deputy Director of the School-Enterprise Cooperation Management Center、Chen Xuebin, Secretary of the Party Committee of the Institute of Intelligent Manufacturing and Control Technology、Vice Dean Li Yu、Liu Xiaochun, professional leader of electrical engineering and automation、Wang Weijun, the professional leader of robot engineering, and a group of six people went to Shuhe Hydropower Plant to carry out "production、Study、Research" cooperation and exchange。
First,Member of the Party Committee of Hanjiang Company、Deputy General Manager、Secretary of the Party Branch of Shuhe Hydropower Plant、Accompanied by factory director Dong Ning,Our school staff visited the generator floor of the hydropower plant、Turbine layer、Flood gate、Central control room and hydropower unit simulation operation training room,Understanding grid-connected power generation、Tubular flow unit operation and maintenance、Smart power dispatching, etc.。
Subsequently,The two sides carried out "production、Study、Research" Cooperation m88 live casino and sports bettingm88 online sports bettingand Exchange Meeting,First,Director Dong Ning extended a warm welcome to the representatives of our school,And introduced the organizational structure of Hanjiang Company and Shuhe Hydropower Plant、Development history and future goals of building “integrated operation and maintenance” smart hydropower。Hope to establish long-term industry-university-research cooperation with our school,Promote the transfer and transformation of scientific and technological achievements in hydropower。Complementing the advantages of "scholars + engineers" resources,Transform university scientific research results to solve corporate R&D technical difficulties,Revolving around the hydropower energy industry industry chain,Jointly build a technological innovation platform。
Vice President Zhu Yanbo expressed his gratitude to the hydropower plant for their warm hospitality,And learn from the history and characteristics of our school、School advantages and strength、Education and teaching level and talent training quality、School-enterprise cooperation and industry-education integration collaborative education、Detailed introduction to the current main tasks and development vision。At the same time,Hope to take this exchange meeting as an opportunity,Develop multiple levels、Multiple forms、Comprehensive cooperation in multiple fields。
final,Both parties discuss how to carry out industry-university-research cooperation,In-depth exchanges m88 online bettingand discussions from different m88 online sports bettingperspectives,And in internship training、Collaborative education、Teacher training、Professional construction、Reached intention to cooperate on horizontal issues and other aspects。
This exchange event,Further enhances the in-depth understanding between the school and the enterprise,And laid a solid foundation for further school-enterprise collaboration,Promote common development。
Datang Electric Power Shaanxi Hanjiang Investment and Development Co., Ltd. is based on the Shaanxi Provincial Committee、The Provincial Government “Develops Han River Cascade Hydropower Stations,The strategic initiative to "revitalize the economy of southern Shaanxi" was established in 2002。Shuhe Hydropower Plant is invested and constructed by Shaanxi Hanjiang Investment and Development Co., Ltd.,is the sixth cascade power station in the cascade development plan on the upper reaches of the Han River,Normal water storage level 217.30m,Dam top elevation 230M,Reservoir capacity 176 million cubic meters,Total installed capacity 276MW,The annual average power generation is 953 million kW.h,Annual utilization hours 3530h。