Keep away the chill with your heart,Warming the campus with affection—heating the south campus of our school in advance,Turn on "warm mode"
m88 live casino and sports bettingThe campus in early winter is accompanied by the first snow in 2023,Sudden drop in temperature,It’s chilly,To create a comfortable living and working environment for teachers and students,Our school’s South Campus at 2 pm on November 11th,Heating officially started。
To ensure the smooth progress of heating work in winter,Logistics Management Office、The Water and Power Operation and Maintenance Department of the Logistics Industry Group is arranged according to the school,Start heating preparations in mid-October。From mid-October m88 best betting websiteto early November,Maintain the heating equipment of the whole school,Replacement of faulty heating valves, etc.。
In response to the sudden drop in temperature,Turn on heating equipment in advance。Strengthen personnel inspections in pump rooms,Check the operation status of all equipment in the pump room one by one,Heating speed、Real-time load、Parameters such as supply and return water pressure,Repair and eliminate equipment faults; check the heating temperature of each heating end radiator、Cleaning up blockage in maintenance pipe network,Ensure the m88 slot machine casinosafe operation of the heating pipe network system。
Teachers and students first,Service first,During the heating season,The Water and Power Operation and Maintenance Department of Logistics Industry Group will implement a 24-hour duty system,Real-time detection of water temperature and boiler operation status,Do a good job in equipment maintenance and handling of heating emergencies,Build a warm barrier for the teachers and students of the school in winter。