1.1 These implementation rules are formulated in accordance with the Fire Protection Law of the People's Republic of China and the Certification and Accreditation Regulations of the People's Republic of China。
1.2 This implementation rule applies to factory shipments within the territory of the People’s Republic of China、Sales、Product certification for fire emergency lighting and evacuation indication systems imported or used in other business activities。
1.3 These Implementation Rules consist of general provisions and attachments.
1.4 Products certified according to these implementation rules shall comply with relevant national laws、Regulations and countries、Related provisions of industry standards。
Type test+Initial factory inspection+Post-certification supervision
CertificationApply
Type test
Factory inspection
Certification result evaluation and approval
Supervision after certification
4.1.1 Certification unit division
See the attachment for the principles of division of certification units1。
Same manufacturer、Same product model,Products from different factories have different certification units。
4.1.2 Application documents
Please see the attachment for the information required for certification application2。
4.2.1 Sampling for type testing
4.2.1.1 Principles for sample delivery
In principle, each unit applying for certification is regarded as a sample delivery unit。Representative samples should be selected from the main type samples in the unit。
4.2.1.2Sample delivery quantity
Samples for type testing are selected and sent by the client in accordance with the requirements of the designated certification agency,And is responsible for the selection and delivery of samples,Please see the attachment for sample quantity and requirements3。Samples must be products produced within the past 10 months and passed factory inspection,And within the product validity period。
4.2.1.3 Disposal of type test samples
After type test,Samples after testing should be disposed of in an appropriate manner。State-specific regulations,Follow relevant regulations。
4.2.2 Inspection agency
The inspection is carried out by a designated inspection agency entrusted by the designated certification agency.
4.2.3 Inspection Procedure
4.2.3.1 The designated inspection agency shall verify the integrity of the sample before inspection、Verification of compliance, etc.。
4.2.3.2 The designated inspection agency shall implement the inspection basis specified in Annex 3 of these rules、Inspection items、Sampling
Methods and decision rules.
4.2.3.3 After the inspection,The designated inspection agency shall submit the type test report to the designated certification agency as required,The inspection report should include descriptions of samples and key parts。
4.3.1 Factory inspector
The client who has passed the type test,The certification body organizes and arranges factory inspection teams。The inspection team is composed of personnel with specified qualifications。The number of inspectors inspecting the same factory shall not be less than2Name.
4.3.2 Factory inspection time
The factory inspection time is determined based on the unit of the product entrusted for certification and the number of covered product models,And consider the production scale of the factory,Generally, each processing place is2-4 person days.
4.3.3 Factory inspection content
The content of the initial factory inspection is factory quality assurance capability inspection and product consistency inspection。
4.3.3.1 Factory quality assurance capability inspection
Factory inspectors inspect the production plant in accordance with the attachment4Inspect factory quality assurance capabilities。At the same time,It should also be verified in accordance with Attachment 5。
4.3.3.2 Product consistency check
Should be at the production site/The finished product warehouse will take at least one sample from each unit of product applying for certification to check product consistency,Check its consistency with the type test report and the product characteristics document confirmed by the designated inspection agency。
4.3.4 Factory quality assurance capabilities and product consistency inspections should cover all factories that entrust certified products。
4.4.1 Certification result evaluation and approval
The certification body conducts a comprehensive evaluation of product testing and factory inspection results。Assessed by certification body,The certification result meets the requirements,A certification certificate is issued according to the certification unit; the certification result does not meet the requirements,Termination of this certification。
4.4.2 Certification time limit
The certification time limit is from the date of formal acceptance of certification to the actual working day when the certification certificate is issued,Including product testing time、Factory inspection time、Certification result evaluation and approval time、Certificate production time。
The product testing time is calculated from the date the sample is delivered to the designated inspection agency and officially accepted,Product inspection time should be completed within the published inspection cycle,The submission of product inspection reports generally does not exceed5 working days.
Submit factory inspection report not exceeding5 working days,Complete on-site inspection with inspection team,Calculated from the date of receipt of the rectification information for non-conforming items submitted by the factory。
Factory inspection time、The evaluation and approval time for certification results and the production time for certificates generally do not exceed60 working days.
4.5.1 Frequency of supervision after certification
4.5.1.1 Certified products start from the date of certificate approval,You can arrange post-certification supervision。Post-certification supervision shall not be less than every year
Once.
4.5.1.2 If one of the following situations occurs, the frequency of supervision can be increased:
1) The certified product has serious quality problems or the user has complained about the product and it has been verified;
2) When the designated certification body has sufficient reasons to question the conformity of the certified product with the standard requirements specified in these implementation rules;
3) Supervision and inspection、Products with many unqualified items in supervision and inspection;
4) There is sufficient information indicating that the factory has changed its organizational structure、Production conditions、Quality management system, etc.,When this may affect product compliance or consistency。
4.5.2 Supervision methods after certification
1) Factory supervision and inspection and product supervision and inspection;
2) Factory supervision and inspection;
3) Product supervision and inspection.
4.5.3 Factory supervision and inspection contents and conclusions
4.5.3.1 Product consistency check
Same rulesProvisions of 4.3.3.2。The conclusion of product consistency verification is conformity or non-conformity。
4.5.3.2 Factory quality assurance capability supervision and inspection
Factory quality assurance capability supervision and inspection according to the attachment4 regulations to proceed。The time for factory quality assurance capability supervision and inspection is 1-2 man-days per site。The content of supervision and inspection shall be carried out by the certification body according to the annual supervision plan according to the specific circumstances,Supervision can be done either at the factory or at the place of use.
The conclusion of the factory quality assurance capability supervision inspection is recommended or not recommended。
The rectification period for unqualified items has exceeded1 month,The factory quality assurance capability supervision and inspection conclusion is not recommended to pass。
The first time after obtaining the certificate5 years,The factory should be inspected for renewal of certificates in accordance with the provisions of Attachment 4。The content and number of man-days for certificate renewal inspection are the same as those for the initial factory inspection。
4.5.4 Product Supervision and Inspection
Product supervision and inspection can take samples from the factory,Sampling can also be done at the place of use,Selection of samples to be inspected、Sample
The quantity and inspection items shall be stipulated by the certification body according to the annual supervision plan depending on the specific circumstances。
4.5.5 Evaluation of post-certification supervision results
Assessed by certification body,Supervision conclusion qualified,The certification body maintains its certificate; supervision conclusion is unsatisfactory,The certification body suspends or revokes its certificate according to regulations。
If you maintain the certification certificate, continue to use the certification mark.Suspend or revokeAuthentication certificate,Stop using the certification mark,And announce it to the public。
The validity of the certification certificate is maintained through regular and irregular supervision by the certification body。
5.2.1 Types of changes
5.2.1.1 Changes not involving product safety performance: gains caused by changes in product naming methods
Certified product name、Model change; Product model change、The internal structure remains unchanged; the name or address of the entrusting party (manufacturer or factory) changes (no relocation), etc.。
5.2.1.2 Changes involving product safety performance: manufacturer or factory relocation; basis for product certification
Standard、The technical m88 online bettingm88 online bettingspecifications or certification implementation rules have changed; the design that significantly affects the product has changed,Key components of certified products/Replacement of raw materials/components; changes in the quality system of the principal (manufacturer or factory) (such as ownership、Changes in organizational structure or managers, etc.)。
5.2.2 Change Procedure
5.2.2.1 When the certification certificate holder needs to change the certification certificate information or products that have been obtained,Should formally report to
The certification body submits a change application and submits relevant supporting documents.
5.2.2.2 The certification body will review the change application and relevant information after receiving it,Verify changed information or products
Consistency with the original certified information or product,Arrange changes to factory confirmation inspection and if necessary/Or confirm inspection.
5.2.2.3 Results confirmed based on changes,Assessment according to prescribed procedures,Meet the change requirements,Certified agency
After approval, the certificate will be renewed or a change confirmation notice will be issued to the holder,And change related information。Does not meet the change requirements,Do not accept or change confirmation。
Certification certificate holders add new product units based on the original certification、Model,A formal application should be made,After review by the certification body,Arrange product inspection and inspection if necessary/or factory inspection,Assessed by certification body,A certificate is issued or renewed if the certification result meets the requirements。
m88 online bettingWithin the validity period of the certificate,The products covered by the certificate have one of the following conditions,Suspended certificate and
Logo, certificate kept by certification authority:
1) Unable to accept supervision;
2) Supervision and inspection failed;
3) Supervision and inspection failed;
4) Failure in national, industry and local supervision and inspection;
5) The certificate holder does not use the certificate according to the rules、logo,Or certificate not executed、Flag management requirements;
6) Suspension of production for more than three months during the normal production cycle;
7)After the production plant is relocated,The certificate holder has not applied for factory condition confirmation;
8) The certification principal applied for suspension;
9) Other behaviors that violate the provisions of these rules.
5.4.2 Resumption of suspended certificate
The certificate holder applies to the certification body,The certification body will conduct relevant verification based on the reasons for suspension,Confirmed to meet the requirements for maintaining certificates,Certification agency approves the resumption of use of certificates and logos。
5.4.3 One of the following situations occurs,The certification authority revokes the certificate held by the holder:
1) Changes in product standards or certification rules,Certificate holder cannot guarantee compliance with the new requirements;
2)Refuse to accept supervision;
3) The product has serious quality problems;
4) Failed to pass supervision twice in a row;
5) Relying on unfair means to obtain certificates;
6) Misuse of certificates and/or inspection reports,If transferred、Lending, etc.;
7) Alteration or forgery of inspection reports, certificates, and signs;
8)Certificate suspension period,Certificate holder is still producing、Sales、Install a product with a suspended certificate;
9) Certificate suspension period,Failure to take corrective measures as required:
10) Abuse flag,Such as transferring, reselling or using uncertified products;
11) Failure to pay fees as required;
12)Confirmed,There are factors that may cause serious quality problems or cause serious harmful consequences
13) SupervisionIt is found that the certified product is inconsistent with the sample provided by the certification client。
5.4.4 If one of the following circumstances occurs, the certification body will cancel its certificate:
1) Certification principal applicationLog outof;
2)The certificate holder has been canceled;
3) Product standards are invalidated, etc.;
4) Other situations where the certificate should be canceled (such as laws and regulations, etc.)。
5.4.5 Self-certification certificate cancellation、From the date of revocation or during the period of suspension of the certification certificate,Products must not continue to leave the factory、Sales、Import or use in other business activities。The original license holder shall start from the date of receipt of the noticeReturn the certificate to the certification authority within 10 working days,Search flag。
The validity period of the product certification certificate covered by this rule is5Year.
Certificate validity expires,Need to continue using,The certification client shall complete the certification before the validity period of the certification certificate expires90Apply within days.
Products approved for certification must use a unified logo,See the picture below for the logo style:
See attachment for logo specifications6。
The logo should be placed in a conspicuous position on the product。The sign should be kept flat、Intact,Prevent damage、Lost。
8.1 If the client is dissatisfied with the certification activities and/or decisions made by the certification body or designated inspection body,A formal appeal or complaint may be made。Any person or unit is dissatisfied with the products of the certified enterprise,Formal complaints may be made to the certification body。
8.2 Certification body formulates appeal、Complaint Procedure,A specialized department is responsible for handling complaints from all parties、Complaint,After investigation, verification and approval,Take handling measures。
8.3 The certification body saves all product certification appeals、Record of complaint handling results。
Certification fees are collected uniformly by the certification agency in accordance with relevant regulations.
1, unit division description
Serial number
Product name
Unit division principle
According to standards
1
Fire emergency sign lamps
1) Basic principles, basic circuit designdifferent,Cannot be used as an application unit; basic principle、The basic circuit design is the same,But there are major differences that affect product performance,Cannot be used as an application unit;
2) Marking lights installed on the ground or installed in other ways cannot be used as an application unit;
3) Extra large size specified in Appendix C of GB17945-2010、Large、Medium-sized and small-sized sign lights cannot be used as an application unit;
GB17945-2010
2
Fire emergency lighting fixtures
2) The main technical parameters of the light source are different,Cannot be used as an application unit.
3
Emergency lighting controller
2) Communication method、Signal processing method、Different internal bus structure,Cannot be used as an application unit.
4
Special emergency power supply for fire emergency lighting (fire emergency lighting centralized power supply)
2) The input and output voltages are different and cannot be used as one application unit;
3) Inverter、Different transformers,Cannot be used as an application unit;
4) Single battery capacity、Different charging and protection methods,Cannot be used as an application unit.
Note:1、Single-sided display and double-sided display sign lights can be used as one application unit, In the same application unit, double-sided display sign lights should be selected as the main product。
2、Only sign lights with different graphic indicators can be applied as one model product,Select 2 sign lights with graphic indicators specified in Figure B.4 in Appendix B of GB17945-2010 when submitting for inspection,and Figure B.1、Figure B.2、1 set of sign lights each for the graphic indicator signs specified in Figure B.5 and Figure B.6,and from Figure B.1、One set of each sign lamp for the graphic indicator sign composed of Figure B.2 and Figure B.5 shall be inspected,The sign lights of the above graphics cover the sign lights with the same main graphic indication signs and only add auxiliary text that meets the requirements of B.1.3 in Appendix B; for the sign lights used to display floors,Only select 1F and -2F graphic signs for inspection,can cover the same font、Same size、Floor display sign lights with different numbers; describe the inspection graphic sign in the inspection report。
3、Special emergency power supply for fire emergency lighting (fire emergency lighting centralized power supply) type product and its main type product are regarded as one
application units,Reduction in battery cabinets and power reduction caused by the reduction of battery packs,Can be used as a sub-type product of the main type,The product with the highest power in the same application unit should be selected as the main product;
2 Typical product
Typical product
Centralized power fire emergency lighting fixtures
Centralized control fire emergency lighting fixtures
Centralized power supply and centralized control fire emergency lighting fixtures
5
6
Centralized power fire emergency sign lamp
7
Centralized control fire emergency sign lamp
8
Centralized power supply and centralized control fire emergency sign lamps
9
Fire emergency lighting sign composite lamp
10
Centralized power fire emergency lighting sign composite lamp
11
Centralized control fire emergency lighting sign composite lamp
12
Centralized power supply and centralized control fire emergency lighting sign composite lamp
13
14
Fire protection product certification entrusts the direction to submit an application to the designated certification agency,And accompanied by the following information:
1. Client/Manufacturer/Basic information and qualification certificate of the factory (business license、Organization code certificate、Related cooperation agreement, etc.);
2.Contract;
3. Type test report and product characteristics document stamped and confirmed by the designated inspection agency;
4. The products applying for certification and the raw materials/components/spare parts used involve production safety、Environmental protection、Inspection and quarantine and other safety regulations,Must obtain relevant permission、Application for certification can only be made after certification or passing inspection and quarantine,Relevant supporting documents must be included in the certification application documents。
5. Product certification certificate (when the certificate is extended);
6. Other documents required by the certification body.
1 Type test
1.1 Inspection basis
GB17945-2010 "Fire Emergency Lighting and Evacuation Instruction System"。
1.2 Inspection items
1.2.1 The inspection items of the main product are all test items specified in GB17945-2010 "Fire Emergency Lighting and Evacuation Instruction System"。
1.2.2 Only the same dimensions as the main product、The inspection items for different types of products with different installation methods or shell materials are:
a) Inspection before test;
b) Basic function test;
c) Enclosure protection level test.
1.2.3 The inspection items for subtype products that are different from the main type product shall be determined by the certification body based on the difference between the subtype product and the main type product。
1.3 Sampling method
1.3.1 Sampling method
Randomly select samples from products that have passed factory inspection.
1.3.2 Sampling base
1.3.2.1 The sampling base of each model of fire emergency lighting products shall be no less than 30 units。
1.3.2.2 The sampling base of each model of emergency lighting controller shall be no less than 5 units。
1.3.2.3 Special emergency power supply for fire emergency lighting (fire emergency lighting centralized power supply), the sampling base of each model product shall be no less than 5 units。
1.3.3 Sample quantity
Main product2 sets, 1 set of split products.
1.4 Judgment Criteria
PressThe type inspection results are determined according to the method specified in GB12978 "Inspection Rules for Fire-fighting Electronic Products"。
2 Supervision and Inspection
2.1 Inspection basis
2.2 Inspection items
Determined by the certification body.
2.3 Sampling method
2.3.1 The sampling method is to randomly select samples from products that have passed factory inspection。
2.3.2 The sampling base is the number of samples for each model that meets the supervisory inspection requirements.
2.3.3 The sample quantity is 1 unit.
2.4 Judgment Criteria
PressThe supervisory inspection result determination method specified in GB12978 "Firefighting Electronic Products Inspection Rules" is carried out。
To ensure the consistency of the product with the samples that have passed the type test,The factory should meet the product quality assurance capability requirements specified in this document。
1. Responsibilities and Resources
1.1 Responsibilities
The factory should stipulate the responsibilities and interrelationships of various personnel related to quality activities,And the factory should designate a quality person in charge within the organization,Regardless of the member’s other responsibilities,Should have the following responsibilities and authorities:
a) Responsible for establishing a quality system that meets the requirements of this document,And ensure its implementation and maintenance;
b) Ensure that products bearing the mark meet the requirements of product standards;
c) Create documented procedures,Ensure proper care and use of signs;
d) Create documented procedures,Ensure that non-conforming products and certified products are changed without confirmation by the certification body,No logo。
The person in charge of quality should have sufficient ability to perform his job.
1.2 Resources
The factory should be equipped with necessary production equipment and inspection equipment to meet the requirements for stable production of products that comply with regulations; it should be equipped with corresponding human resources,Ensure that personnel engaged in work that affects product quality have the necessary capabilities; establish and maintain appropriate product production、Inspection、Test、Necessary environment such as storage。
Regulations on national security、Health regulations、Environmental protection regulations and other regulations clearly stipulate that labor must be carried out、Production positions with safety protection measures、Storage locations and inspection positions,FactoryRequiredCreateSafe operating regulations for these positions、Management requirements and other documents,Position personnel must obtain a qualification certificate issued by the state。
The production capacity scale of the factory should comply with the relevant national industrial policy requirements。
2.Documents and Records
2.1 Factory should be established、Maintain a documented quality plan or similar document,And the documents required to ensure the effective operation and control of relevant processes of product quality。Quality plan should include product designTarget、Implementation process、Regulations on testing and related resources,and changes to certified products after the product is certified (standard、Craftsmanship、Key parts, etc.)、Use of logoManagementetc.
Product design standards or specifications should be an element of the quality plan, its requirements should not be lower than the national standard requirements for the product。
2.2 The factory shall establish and maintain documented procedures to comply with this documentpiecesEffective control of required documents and information。These controls shall ensure:
a) Documents and changes should be approved by the authorized person before release,To ensure its suitability;
b) Change and revision status of files identified,Prevent unintended use of obsolete files;
c) Ensure that a valid version of the corresponding document is available where used。
2.3 The factory should establish and maintain identification of quality records、Save、Documented procedures for safekeeping and processing,Quality records should be clear、Complete as evidence that the product meets the specified requirements。
Quality records should be kept for an appropriate period.
3. Purchasing and incoming inspection
3.1 Supplier’s Control
Factories should formulate the selection of suppliers of key components and materials、Procedures for assessment and daily management,To ensure that suppliers have the ability to produce key components and materials that meet requirements。
Factories should keep records of supplier selection, evaluation and daily management。
3.2 Inspection/verification of key components and materials
Factories should establish and maintain inspection or verification procedures and regular confirmation inspection procedures for key components and materials provided by suppliers,To ensure that key components and materials meet the requirements stipulated in type approval。
Inspection of key components and materials can be carried out by the factory,Can also be done by the supplier。When inspected by supplier, The factory should put forward clear inspection requirements to suppliers。
Factories should keep inspection or verification records of key parts、Confirm the inspection records and the certificate of conformity and relevant inspection data provided by the supplier。
Factories should adopt safety measures for personal safety、Environmentally harmless raw materials、Semi-finished product、Components, etc.。Due to process and technical requirements、The use of raw materials that may be harmful to personal or environmental safety due to unavoidable reasons such as formula requirements、Semi-finished product、Components isochronous,Must have relevant safety production department or environmental protection department、Permission from the health and epidemic prevention department。
4. Production process control and process inspection
4.1 The factory should identify key production processes,Key process operators should have corresponding abilities,If the process is not documented and the product quality cannot be guaranteed,Corresponding process operation instructions should be formulated,Keep the production process under control.
4.2 If there are any requirements on environmental conditions during product production,The factory should ensure that the working environment meets the specified requirements。
4.3 when feasible,Factory should monitor appropriate process parameters and product characteristics。
4.4 The factory should establish and maintain a system for maintenance of production equipment。
4.5 Factories should inspect products at appropriate stages of production,To ensureProducts and partsConsistent with sample.
4.6 productThe production process may produce substances that may affect personal safety and environmental protection requirements,Effective prevention should be taken、Protective Measures, equippedSafety Managementmeans,DeserveGovernment permission orPassedThird party assessment.
5. Routine inspection and confirmation inspection
Factory should develop and maintain documented routine inspection and confirmation inspection procedures,To verify that the product meets specified requirements。Inspection items should be included in the inspection procedure、Content、Method、Judgment, etc.。And inspection records should be kept。Specific routine inspection and confirmation inspection requirements shall be implemented in accordance with the requirements of the implementation rules of the corresponding products。
Routine inspections are performed on products on the production line during the final stages of production100% inspection,After usual inspection,Except packaging and labeling,No further processing。
Confirmation inspection is a sampling inspection conducted to verify that the product continues to meet standard requirements。
6. Inspection testInstrumentEquipment
Equipment used for inspection and testing should be regularly calibrated and inspected,And meet the inspection and test capabilities。
Inspection and testing instruments and equipment should have operating procedures,Inspection personnel should be able to follow the requirements of operating procedures,Use instruments and equipment accurately。
6.1 Calibrationsum test
The inspection and testing equipment used to determine that the products produced meet the specified requirements should be calibrated or verified according to the specified period。Calibration or verification should be traceable to national or international standards。For self-calibration,The calibration method should be specified、Acceptance criteria and calibration cycle, etc.。The calibration status of the equipment should be easily identifiable by users and managers。
Calibration records of the equipment should be maintained.
6.2 RunCheck
In addition to daily operational inspections, equipment used for routine inspections and confirmation inspections shall be carried out,A running check should also be performed。When m88 online sports bettingit m88 best betting websiteis found that the operation check results cannot meet the specified requirements,Should be traceable to the tested product。When necessary, these products should be re-tested。The measures that operators need to take when discovering equipment malfunction should be specified。
The operation inspection results and adjustments and other measures taken should be recorded.
7. Control of defective products
Factories should establish nonconforming product control procedures,The content should include the identification method of non-conforming products、Isolation and disposal and corrections taken、Preventive measures。After repair、Reworked products should be re-tested。Repair of important parts or components should be recorded accordingly,Records of disposal of nonconforming products should be kept。
8. Internal quality audit
Factories should establish documented internal quality audit procedures,Ensure the effectiveness of the quality system and the consistency of type-approved products,And record the internal audit results。
Complaints about factories, especially complaints about products not meeting standard requirements,Records should be kept,And should be used as information input for internal quality audits。
Problems found during the review,Corrective and preventive actions should be taken,And record。
9.Product consistency
The factory should control the consistency of mass-produced products and products that have passed the type test,In order to ensure that type-approved products continue to meet the specified requirements。
Factories should establish key components and materials for products、Change control procedures for factors such as structure that affect product compliance with specified requirements,Product changes (which may affect compliance with relevant standards or consistency of type test samples) should be reported to the certification body before implementation and must be approved before implementation。
10. Packaging, handling and storage
Any packaging performed by the factory、The handling operation and storage environment should not affect the product's compliance with the specified standards。
11. Minimum configuration requirements for production and inspection equipment
Table3-1Minimum configuration requirements for fire emergency lighting product production and inspection equipment
set Prepared name Name
Technology Skill Yes Asking
Brightness meter (production of emergency sign lights)
Should satisfyGB17945-2010 6.3.1.3 Article regulations.
Brightness measurement range coverage: (0~300)cd/m2
Photometer (production of emergency lighting)
Should satisfyGB17945-2010 6.3.1 .4Article regulations.
The measuring range meets the needs of product production.
Ammeter
Should satisfyGB17945-2010 6.4.1 Article regulations.
Minimum resolution:0.1uA。
voltmeter
Minimum resolution:0.1mV
Measuring time instrument
Should satisfyGB17945-2010 6.3.1.1、6.3.1.2 Article regulations.
Insulation resistance testing equipment
Should satisfyGB17945-2010 7.8.2 Article regulations.
Test voltage: DC (500±50)V
Measurement range: (0~500)MΩ
Minimum graduation:0.1 MΩ
plan Time: (60±5)s
Withstand voltage test equipment
Should satisfyGB17945-2010 7.10.2 Article regulations.
Test power supply: Test power supply (0~1500)V(Valid value)Continuously adjustable, frequency50Hz。
liter(drop)pressure rate: (100~500)V/s
Constant heat and humidity test chamber
Should satisfyGB17945-2010 7.13.2 Article regulations.
Temperature tolerance range:±2℃
Relative humidity range: (90-95) %RH
Voltage fluctuation test device
Should satisfyGB17945-2010 7.5.2 Article regulations.
Spot thermometer or other temperature measuring instrument
Darkroom
Able to test surface brightness.
Circuit board online testing equipment
Should meet the company’s regulations on circuit board process inspection.
Functional test bench
Should meet the enterprise’s requirements for basic functional inspection of products.
Production line
Should meet the welding and assembly production requirements of the enterprise.
Table3-2 Minimum configuration requirements for emergency lighting controller product production and inspection equipment
Basic function test device
Table3-3 Special emergency power supply for fire emergency lighting (fire emergency lighting centralized power supply)Minimum configuration requirements for product production and inspection equipment
Should satisfyGB17945-2010 7.2.3Article regulations; power load power should match the specifications of the product。
Should satisfyGB17945-2010 6.4.2 Article regulations.
Enter220VAC, output(100~250) VACContinuously adjustable.
To ensure factory mass productionwithConformity of samples that have passed the type test,The production of type-approved products shall meet the consistency control requirements specified in this document。
1 Product consistency control file
1.1 The factory should establish and maintain type approval product consistency control documents,The consistency control file should include at least:
1) Design requirements for specific type approved product models、Product structure description、Bill of materials (should include the models of key components used、Main parameters and suppliers) and other technical documents;
2) Production process technology for specific products、Produce ingredient lists and other production control documents;
3) Product inspection (including incominggoodsInspection、Production process inspection、Routine inspection and confirmation inspection of finished products)request、Quality control documents such as methods and related resource conditions and equipment;
4) Changes to products after certification (including standards、Craftsmanship、Key parts and other changes) control、Program files such as logo usage management。
1.2 Product design standards or specifications should be one of the contents of the consistency control document,The requirements should be no less than the standard requirements specified in the type approval implementation rules for the product。
2 Inspection of key parts and materials/Verification
Factories should establish and maintain procedures for inspection or verification of key components and materials provided by suppliers,To ensure that key parts and materials meet the requirements stipulated in type approval。
Inspection of key parts and materials can be carried out by the factory,Can also be done by the supplier。When inspected by supplier,Factories should set clear inspection requirements for suppliers.
Factories should keep key parts and material inspection or verification records、Conformity certificate and relevant inspection data provided by the supplier。
3 Consistency of mass production products
The factory should take appropriate measures,Ensure that mass-produced type-approved products are consistent with type-test qualified samples in at least the following aspects:
1)Product nameplate、logo、Product name indicated on the instructions and packaging、Specifications and models;
2) Product structure, size and installation method;
3) Power supply for the product、Safety Structure、Safety components、Main components that affect electromagnetic compatibility performance、Key components that affect function and performance。
4 Routine inspection and confirmation inspection
4.1 The factory should develop and maintain documented routine inspection and confirmation inspection procedures,To verify that the product meets specified requirements。Inspection items should be included in the inspection procedure、Content、Method、Judgment criteria, etc.。Inspection records should be kept。
4.2 Routine inspection is a 100% inspection of products on the production line at the final stage of production,After usual inspection,Except packaging and labeling,No further processing。Routine inspections are permitted using proven equivalent rapid online inspection methods。Routine inspection should include at least the following inspection items:
1) Fire emergency lighting: basic function test、Insulation resistance test, withstand voltage test;
2) Emergency lighting controller: basic functionsTest、Insulation resistance test, withstand voltage test;
3) Special emergency power supply for fire emergency lighting (fire emergency lighting centralized power supply): basic functionsTest, charge and discharge test,Insulation resistance test、Withstand voltage test、Repeated conversion test、Conversion voltage test。
The factory production site should have the inspection capabilities for the above-mentioned corresponding type approval product inspection items。
4.3 Confirmation inspection is a sampling inspection conducted to verify that the product continues to meet standard requirements。Confirmation inspection should include at least the following inspection items:
1. Fire emergency lighting:Inspection before test,Charge、Discharge test、Repeated conversion test、Conversion voltage test、Charge and discharge endurance test,Ground resistance、Low temperature test、Constant heat and humidity test、Vibration test;
2. Emergency lighting controller:Inspection before test,Ground resistance、Low temperature test、Constant humidity and heat test, electrostatic discharge immunity test, power transientTest、RF electromagnetic field radiation immunity test;
3. Special emergency power supply for fire emergency lighting (fire emergency lighting centralized power supply):Inspection before test,Charge and discharge endurance test,Ground resistance test,Constant humidity and heat test, electrostatic discharge immunity test, surge (impact)Immunity test, power transientTest, voltage dips, short interruptions and voltage changesImmunity test.
Confirmation inspection items that the factory does not have inspection conditions,You can entrust a testing laboratory with corresponding capabilities for inspection。
5 Change control of certified products
Factories should establish documented change control procedures,Ensure product design、Key parts and materials used as well as production processes、Changes in inspection conditions and other factors are effectively controlled。The certified products involve the following changes,Factories should declare to the certification body before implementation,Execution only after approval:
1) Changes in product design (principle, structure, etc.);
2) Changes in key parts and key materials used in products;
3) Changes in key processes, processes and production equipment;
4) Routine inspection and confirmation of changes in inspection conditions and methods;
5)Relocation of production site、Changes such as version change of production quality system;
6) Other changes that may affect compliance with relevant standards or consistency of type test samples。
Products approved for certification must use a unified logo,See the logo style below
Picture:
Fire emergency sign lamps、The fire emergency lighting fixture sign type isType I,Specification is 18mm×33mm;
Emergency lighting controller、Special emergency power supply for fire emergency lighting (fire emergency lighting centralized power supply) sign type isType II,Specification is 35mm×45mm。